Services

Services from study to construction

Support is tailored to activity scale, authority, location, and existing permit status.

ENVIRONMENTAL DOCUMENTS & APPROVALS

Environmental document and approval services

Support is tailored to activity scale, authority, location, and existing permit status.

01AMDAL and UKL-UPL→02DELH and DPLH→
03Environmental Approval
04Traffic Impact Analysis (Andalalin)
05Hazardous Waste Technical Details→
06SIPA (Groundwater Use Permit)
TECHNICAL, OPERATIONS & REPORTING

Technical, operations, and reporting services

Technical study for meeting emission quality standards.
Study for meeting wastewater quality standards (BMAL).
Support for SLO technical and administrative readiness.
RKL-RPL / UKL-UPL Reporting
Preparing environmental management and monitoring implementation reports.
Environmental Audit and Monitoring
Inspection of site conditions, documents, and follow-up.
PROPER Assistance
Mapping compliance evidence and strengthening assessment readiness.
PERMITTING FRAMEWORK

Environmental permitting framework

Environmental approval is a prerequisite linked to business licensing.

LEGAL BASIS
PP 22 Tahun 2021
Implementation of Environmental Protection and Management
Permen LHK 4 Tahun 2021
List of activities requiring AMDAL, UKL-UPL, or SPPL by KBLI code, scale, and activity parameters.
SCREENING CRITERIA
KBLI code and activity description
Production capacity
Land or building area
Location and area sensitivity
SCREENING OUTCOME
AMDALUKL-UPLSPPLDELHDPLH

Implementation principle: The process starts from final business plan data. Spatial conformity, issuing authority, and technical approval needs must be confirmed before submission. Design changes mid-process can change the document type and study scope.

KBLI 42203

Waste treatment infrastructure solutions

Infrastructure needs assessment, system concept development, civil construction, and operational readiness coordination.

Planning focus
✓Fit with waste characteristics
✓Treatment capacity and load
✓Integration with production areas
✓Operation and maintenance access
✓Compliance with technical requirements
KBLI 38110 · 38219

Non-hazardous waste management

Collection and transport
Services for non-hazardous waste, with documented handling flows and appropriate destinations.
Treatment and disposal
Treatment methods match the waste type, facility capability, and permits held directly or through partners.
OUR METHOD

Five stages, from screening to follow-up

01
Screening
Determining obligations, authority, data, and scope.
02
Survey and data collection
Reviewing existing conditions and supporting documents.
03
Drafting and technical study
Turning data into documents and recommendations.
04
Review and revision
Supporting verification, meetings, and document revisions.
05
Approval and follow-up
Delivering outputs and a compliance fulfilment plan.
Contact

Let's discuss your company's environmental needs